Above Board Designs and Custom Furniture, LLC.

Above Board Designs and Custom Furniture, LLC. Custom furniture, hand crafted to last many years. Everything is 100% custom and built by hand!

Shop cleaned, working late tonight to get the backs on all cabinets that are not getting drawers or pullouts. Primer and...
09/10/2026

Shop cleaned, working late tonight to get the backs on all cabinets that are not getting drawers or pullouts. Primer and paint next!

It’s been a long hot week, but I got 9 cabinets, all the shelves, drawer bow parts cut and doors all sanded and ready fo...
09/04/2026

It’s been a long hot week, but I got 9 cabinets, all the shelves, drawer bow parts cut and doors all sanded and ready for paint ! I just have to put the backs in Tuesday and paint will begin after that !

Sanding and prepping for paint! Been a long hot day……3 jobs going at one time. Getting close though.
09/02/2026

Sanding and prepping for paint! Been a long hot day……3 jobs going at one time. Getting close though.

A custom horizontal Murphy bed that we got 3/4s of the way wrapped up this week. Have to remake the panels for a differe...
08/14/2026

A custom horizontal Murphy bed that we got 3/4s of the way wrapped up this week. Have to remake the panels for a different style to finish it off, but Customer is very happy with it. As am I. Now have to start their second job.

Happy 4th of July to all of our friends, family, and clients. We just wrapped this beautiful built-in unit for their rea...
07/01/2026

Happy 4th of July to all of our friends, family, and clients.

We just wrapped this beautiful built-in unit for their reading room right beside their kitchen. They wanted deep drawers in the middle to store their over flow of big pots and pans since their kitchen only came with one deep drawer and upper small drawers for silverware and small items. The opening in the far right door is for the cat because the dog eats the cat food and will harass the cat while it eats.
Everything turned out awesome. They are very happy with it!

Day one of two on this reading room built-in with cat door on the right side! So far it turned out amazing. Just have to...
06/30/2026

Day one of two on this reading room built-in with cat door on the right side! So far it turned out amazing. Just have to put up the crown all the way across and a shelf in between the two upper cabinets. We will wrap this beauty up tomorrow!

It’s been a long few weeks of healing….we had a small garage fire, in the process of getting it out of the garage and ge...
06/24/2026

It’s been a long few weeks of healing….we had a small garage fire, in the process of getting it out of the garage and getting it under control and keeping a propane tank from exploding……I burnt both hands pretty bad…….its nice to be back at work. They healed faster than I expected so I’m happy about that, but still have to watch what I’m doing.
I got these two big jobs i was working on, one of which I was about to install. Hopefully next week we will wrap that one up. In the mean time I’ve been sanding, and spraying top coat on the grey cabinets trying to get them ready for install after next weeks install. Working a late night tonight trying to make up as much time as I can!

Final picture of the built-in makeup vanity with the quartz top installed! It turned out awesome customer was very happy...
06/19/2026

Final picture of the built-in makeup vanity with the quartz top installed! It turned out awesome customer was very happy!

Built-in batbroom makeup vanity, cam and I knocked out this morning. The are ordering a quartz counter top to go in next...
06/04/2026

Built-in batbroom makeup vanity, cam and I knocked out this morning. The are ordering a quartz counter top to go in next week! It turned out awesome. The customer was thrilled.

Been a long day….started this am at 8am, finished the last two coats of the all white painted jobs. One of them 12 ft of...
06/03/2026

Been a long day….started this am at 8am, finished the last two coats of the all white painted jobs. One of them 12 ft of cabinets (see the counter top at the ceiling with a 14ft peak). Then we had to start the grey primer on a Murphy bed built-in unit. I just got done installing all the drawers and runners for a custom makeup vanity that we have to install Thursday. Drawer fronts will go on that Thursday morning. Now I have to prep the drawer fronts and shelves for more grey primer tomorrow am…..needless to say the day isn’t quite over yet. It’s been a huge amount of work for these 3 jobs at the same time. Much thanks to my very patient clients. When everything is hand built, Sanded and then hand finished, it takes more time then I even realize sometimes. However the end result has never ever disappointed anyone.

Address

Longview Court
Youngsville, NC
27596

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+19196675537

Alerts

Be the first to know and let us send you an email when Above Board Designs and Custom Furniture, LLC. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Above Board Designs and Custom Furniture, LLC.:

Shortcuts

Share

Category