09/11/2019
This is the hall bath half of a 2 bathroom remodel. This bath hadn't been touched for approx 25 years. We gutted the bathroom, cabinet, counter, bathtub, drywall where needed around the tub due to mold. Removed insulation and installed new insulation. We had the valves changed. Reinstalled wet area drywall then installed Wedi board over the drywall and sealed the seams and screws with wedi sealant. Then tiled with a beautiful porcelain from Bedrosians and handmade the stone shelves in the corner from travertine from Bedrosians. Then we grouted with customs prism grout. Floor was some with wedi board, matching tile and grout. We also installed the bathroom vanity from one of our cabinet companies we work with. Our granite and quartz fabricator cut, fabricated, polished and installed the quartz counter.