The upper speakers cabinet are now installed. For the last two days myself and a great crew from St Bartholomew's have lifted and installed the top 10ft sections of the speaker cabinets along with the mahogany cross grills. The original cabinets were 17ft high and this brings them to 27ft. All were lifted safely and attached to the walls along with the cover grills. For the cabinets, I converted the scissor lift into a forklift with 2/4's and we hung the grills with a series of rope slings. Finishing up, the Jesus corpus went back up after a summer cleaning.