Alpine Joinery

Alpine Joinery Timeless heirlooms crafted in Salt Lake City.

12/06/2025

Another clock out the door! ***k

New clock headed out the door this week. Made a few changes in the construction process and I’m really happy with how it...
12/05/2025

New clock headed out the door this week. Made a few changes in the construction process and I’m really happy with how it all turned out!

Paint on, paint off.
11/25/2025

Paint on, paint off.

Starting to cut the clock face today! I used to manually cut and place all the numbers and dashes and it would take HOUR...
11/22/2025

Starting to cut the clock face today! I used to manually cut and place all the numbers and dashes and it would take HOURS. This takes, with bit changes and taking my sweet time, 30 minutes. Game changer.

11/21/2025

Building a walnut clock for a customer this week and wanted to share a couple progress shots. This one is in the final stretch—face gets carved and painted next, then a few hours of finish prep to bring everything together.

11/15/2025

Why is double sided tape so good AND so annoying!

Almost embarrassed to show the before picture, but the shop has come a long way!
11/09/2025

Almost embarrassed to show the before picture, but the shop has come a long way!

Cabinets out, floor down, and cabinets back in. I felt pretty accomplished until I saw that the before/after are almost ...
11/02/2025

Cabinets out, floor down, and cabinets back in. I felt pretty accomplished until I saw that the before/after are almost the same…

Interior work is underway. The first row over the self-leveler fought me a bit, but the next went in smooth. At this poi...
10/16/2025

Interior work is underway. The first row over the self-leveler fought me a bit, but the next went in smooth. At this point, moving everything around might take longer than laying the floor—running out of storage fast!

3 of the 4 sides of the exterior are done. These sides were the most problematic for water issues so I’m glad they’re do...
10/15/2025

3 of the 4 sides of the exterior are done. These sides were the most problematic for water issues so I’m glad they’re done. Also poured some extra support under one corner where uncontrolled water had washed it out. Interior is next!

Address

Salt Lake City, UT

Alerts

Be the first to know and let us send you an email when Alpine Joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Alpine Joinery:

Share

Category