05/13/2026
- Old termite damage and an AC drain not properly plumbed.
- Removed all subflooring throughout the house.
- Removed all kitchen cabinets.
- Revamped and sealed AC closet.
- Added new floor joists.
- Sealed all new subfloor.
- Installed moisture barrier and secured new lauan plywood underlayment.
- Laid new floating laminate continuously throughout house.
- Awaiting arrival of new cabinets to be installed to wrap this one up.
“Where Quality and Integrity are Priority”