10/22/2026
The Finish Starts Below the Surface
A successful LVT Glue-Down installation begins with proper subfloor preparation. Before the tiles go down, the surface must be prepared to provide the right foundation for a clean, consistent finish.
From surface preparation and adhesive application to precise tile placement, every stage plays a role in the final result.
Swipe through the process and see how the right preparation makes a difference.
📍 3408 John F. Kennedy Blvd. Jersey City, NJ 07307
📞 201-792-2712