JBM Woodworks, LLC

JBM Woodworks, LLC A variety of wood products and maybe a tune or two.

Just completed an interior project.  RetroCraft Solid Oak Tread Kits with Risers, 5-1/2" Modern Routed Newel Posts, and ...
04/01/2025

Just completed an interior project. RetroCraft Solid Oak Tread Kits with Risers, 5-1/2" Modern Routed Newel Posts, and Foundation Iron Balusters from House of Forgings. Image on the left is the actual finished project. On the right is a rendering we created for the customer prior to ordering any materials.
https://www.facebook.com/houseofforgings

02/28/2025

Send a message to learn more

All set for Fall!  Great project, very pleased with results.  Shout out to Akin Building Center for helping source mater...
10/11/2024

All set for Fall! Great project, very pleased with results. Shout out to Akin Building Center for helping source materials and Dylan Anson Handyman Services for reinstalling the electrical. And, of course to the J and the M for the extra hands when needed. (Photos provided by the homeowner.)

Almost finished up with the porch rebuild. Install the stair rails and some other finishing touches.
10/01/2024

Almost finished up with the porch rebuild. Install the stair rails and some other finishing touches.

Framing was built to allow the deck boards to be set perpendicular to the house, as it was originally.  Floor is pitched...
08/27/2024

Framing was built to allow the deck boards to be set perpendicular to the house, as it was originally. Floor is pitched away from the house at 1” per 4’, again as original.
Steps are built level with equal riser heights. (The originals ranged from 7 to 8 inches)

After tearing off the old decking and stairs.  Since the composite decking requires a maximum joist spacing of 16”, it w...
08/27/2024

After tearing off the old decking and stairs. Since the composite decking requires a maximum joist spacing of 16”, it was decided to tear out the old framing and build new.
The original framing was built as the brick columns were going up. The holes will be filled with mortar.

Late summer project. Tear off and rebuild porch deck, stairs, and railing. Goal is maintenance free. These are the befor...
08/27/2024

Late summer project. Tear off and rebuild porch deck, stairs, and railing. Goal is maintenance free. These are the before pictures.

Installed an iron hand rail at the Creston Publishing Building for the Friends of the Library. Before and after.
08/10/2024

Installed an iron hand rail at the Creston Publishing Building for the Friends of the Library. Before and after.

03/20/2024

Applications

Made good use of a snow day (and the weekend) to hang a couple of recycled doors for Hot Air Brewery.
01/17/2021

Made good use of a snow day (and the weekend) to hang a couple of recycled doors for Hot Air Brewery.

Address

Creston, IA
50801

Telephone

+16417822719

Website

Alerts

Be the first to know and let us send you an email when JBM Woodworks, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share