We did the basement first so we could re-do all plumbing and electrical for both the upstairs remodel and downstairs, total of 5 bathrooms 2 laundries 2 kitchens plus some added features. See previous post for upstairs. We have two of those lifts being used to load sheetrock available as rentals too.