10/06/2025
This is the bathroom we’re working on will show final pictures when complete but so far we have demoed the walls, tore up the subfloor, layed a couple layers of subfloor to bring the height up to match the rest of the house, redid all plumbing and water lines, brand new electrical, hung new moisture resistant Sheetrock, moved water heater from there bedroom closet to the bathroom so they can have there closet back, taped and bedded the sheetrock and now for the smooth coats all over the bathroom, then it will be ready to paint and do flooring. Give us a call we can do it all! 2545590380