09/08/2026
A question we get constantly from designers and builders: who's responsible for field measurements?
We are. We price the job off the architectural set, but once the contract is signed and we start shop drawings, our design team measures the framing directly. From that point the blueprint is a guide and the house is the mandate — whatever is physically standing is what our drawings follow.
The builders we work with frame within about an inch, and some hold closer to a quarter. When we find a discrepancy we bring it to the builder and he decides whether to correct it. If it stays, we scribe to it — the filler is cut to follow the true line of the wall, so there's no gap waiting to be filled with caulk.
All of this is better solved earlier. Bring us in before anything is framed and we can read the architect's plan and catch what won't work. A designer wants a floating vanity the architect never drew — the P-traps have to move up to clear the gap under the cabinet. Caught then, it's a conversation. Caught after framing, it's a change order.
Tap to book a showroom visit.
Full article: https://www.alliancewoodworking.com/who-is-responsible-for-field-measurements/
We measure. The blueprint is a guide, the house is the mandate. What governs shop drawings, what happens when framing is off, and when to call before you frame.