Schilling Milling

Schilling Milling We are a local family with a hobby we love. We have a sawmill and make our own boards and furniture.

The big kiln has doors! 12 foot opening. Still needs to be sealed, vents installed and solar fans installed. Some big pi...
12/28/2025

The big kiln has doors! 12 foot opening. Still needs to be sealed, vents installed and solar fans installed. Some big pieces of white oak need to be milled up for the first load. More to come

Little by little it’s getting there…….should be done by the end of the month and hopefully less eyeball splinters
11/12/2025

Little by little it’s getting there…….should be done by the end of the month and hopefully less eyeball splinters

We were able to make a little bit of progress on kiln today, hope to put the roof on in the next couple of days!
11/09/2025

We were able to make a little bit of progress on kiln today, hope to put the roof on in the next couple of days!

The new and bigger kiln is being started, hope to have it done by the end of November
10/19/2025

The new and bigger kiln is being started, hope to have it done by the end of November

Out with old and in with new (not saying old/new wife, she’s just posing like she always do). We’ll make some touch ups ...
08/31/2025

Out with old and in with new (not saying old/new wife, she’s just posing like she always do). We’ll make some touch ups on the new outbuilding and then onto building a new bigger solar kiln. We have some big white oaks to mill up after that. Sasha is still with us!

We still have a little ways to go. Just getting over having Hyperthyroidism, if you ever had it, it’s a son of a gun to ...
03/09/2025

We still have a little ways to go. Just getting over having Hyperthyroidism, if you ever had it, it’s a son of a gun to say the least!

03/03/2025

Sealing the ends of some fresh cut 10 foot 6x6s to put in the ground

Our temporary structure to cover some of our wood supply took a hit with this previous snow storm. We are suspending any...
02/14/2025

Our temporary structure to cover some of our wood supply took a hit with this previous snow storm. We are suspending any future builds until we build a more permanent structure.

Stop by Revival Spa in Ashland to checkout these cool white Oak table tops!
01/05/2025

Stop by Revival Spa in Ashland to checkout these cool white Oak table tops!

12/27/2024

Milled up 4 logs=22 2x4s, 2-6x6s and a bunch of 1xs

Finally paired the benches with the table
12/10/2024

Finally paired the benches with the table

These are finished! These 2 slabs were on our pile and couldn’t figure out what to do with them.
11/24/2024

These are finished! These 2 slabs were on our pile and couldn’t figure out what to do with them.

Address

Beaverdam, VA
23015

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

+18042127263

Website

Alerts

Be the first to know and let us send you an email when Schilling Milling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Schilling Milling:

Share