04/13/2026
The final weeks of March appear to have focused on vanity installation. A vanity was fitted and a matching wood top was constructed. Additionally, a comprehensive renovation of the half bath was undertaken, including new toilet, lighting, vanity top, and medicine cabinet, while the maister bath received a complete overhaul with new tiled shower, toilet, floor, vanity, top, lighting, and mirrored sliding doors.