05/05/2022
Been a while since we've uploaded anything. Here's a big job we completed in April last year. Removal of landing, stairs and hallway carpet. We then installed 9mm sp101 ply to the landing. With Stairrods UK Ltd divider around the perimeter of the gallery landing. With matching powder coated black trims in the doorways. Amtico keystone was then laid on the landing, half landing and hallway all to match. Downstairs we uncovered a lovely old tile floor. However this was just laid on sand with no dpm due to the age of the property. So this all got uplifted and a new concrete base with dpm was installed. After the given time, we then used F Ball and Co Ltd 1200 and f77 to do a dpm sandwhich. And then installed the remainder if the keystone to the hall and then amtico decor to the inner hallway as a statement entrance peice. On the stairs, because they were in bad shape we had to over ply the stairs. Instead of plying and then leaving edge open to see, we used shims to eliminate this. Then they were fitted with Crucial Trading grand herringbone fossil sisal carpet, and stair rods to match. We also continued this flooring into the lift shaft with matching trims.
Possibly one of the most involved jobs I have done but the outcome is truly amazing!