12/10/2018
Reigate - Update
First and second floor joists are in. Pilot holes were punched through into the existing house to pick up the floor levels.
We set up a hoarding inside the house which allowed us to create the first of the two openings from old to new. Steel is in for this opening and piers re-built below to support the steel by toothing in to the existing brickwork as specified by the drawings.
Bricklayers keep on going up and the next lift of scaffolding is being installed today to allow them to come back next week to finish off.
Roof structure up next πͺπ»π·π»ββοΈπ¨
Thinking of having building work carried out on your home? Give us a call now for a free visit and quotation! βοΈβ‘οΈπ
&sonsltd