01/05/2026
Realising a vision 28 floors above London. đ MOST Architecture acted as the Architect on behalf of the main contractor, BAH, overseeing the technical delivery and coordination of Shanghai Me at the London Hilton Hotel.
The project was a race against time, with an intense eight-month construction programme. Working closely with interior designers FirstWithin, we utilised BIM to navigate the complexities of a high-rise settingâintegrating vital fire strategies and mechanical systems without compromising the rich, Art Deco interior vision.