Ian's Building and Groundwork

Ian's Building and Groundwork Gardening, domestic demolition and building work

Block work nearly done
22/06/2024

Block work nearly done

Internal corridor floor removed ready for blinding dpc, insulation and new concrete floor
22/06/2024

Internal corridor floor removed ready for blinding dpc, insulation and new concrete floor

Protection in place to keep clients main room dust free
22/06/2024

Protection in place to keep clients main room dust free

Boarded and skimmed
22/06/2024

Boarded and skimmed

Props in place joists and steel supported internal wall removed to a level 30mm bellow original foundation ready for con...
22/06/2024

Props in place joists and steel supported internal wall removed to a level 30mm bellow original foundation ready for concrete and block wall

Newly boarded and skimmed looks loads better
22/06/2024

Newly boarded and skimmed looks loads better

Ceiling stripped ready for new subframe and wiring
22/06/2024

Ceiling stripped ready for new subframe and wiring

Foundation poured ready for block work
22/06/2024

Foundation poured ready for block work

Outdoor foundation trench dug 300mm below existing house foundation ready for concrete
22/06/2024

Outdoor foundation trench dug 300mm below existing house foundation ready for concrete

Rendered ready for painting
22/06/2024

Rendered ready for painting

Routed out for needling and then Mortard in at 45mm depth 500mm length
22/06/2024

Routed out for needling and then Mortard in at 45mm depth 500mm length

Address

Leeds
LS12

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Ian's Building and Groundwork posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share