Our aim is to exceed our clients expectations in every way, using a trusted team of high quality, professional local tradesmen and subcontractors and always produce the highest quality of work.

Log cabin decking completed today. Balau tropical hardwood laid in chevron pattern. 2 more weeks till this project is co...
17/06/2017

Log cabin decking completed today. Balau tropical hardwood laid in chevron pattern. 2 more weeks till this project is complete. Full start to finish project pictures will be uploaded one complete

Bathrooms, kitchens, tiling, new builds and full refurbishments. Specialists in carpentry/joinery, plumbing, tiling driv...
10/06/2017

Bathrooms, kitchens, tiling, new builds and full refurbishments. Specialists in carpentry/joinery, plumbing, tiling driveways and project managment. We provide design and fitting. The difference is the finish. For free friendly advice and quotations please don't hesitate to give us a call. All contact info found on this page.

Over 100 mitred cuts, so many angles but well worth it, literally looks like the timber has been folded πŸ‘ŒπŸΌ all about att...
17/05/2017

Over 100 mitred cuts, so many angles but well worth it, literally looks like the timber has been folded πŸ‘ŒπŸΌ all about attention to detail.

Ready to be made water tight. Roofers in tomorrow to seal the lid, waney edge Douglas fur cladding next week. Internal i...
19/04/2017

Ready to be made water tight. Roofers in tomorrow to seal the lid, waney edge Douglas fur cladding next week. Internal insulation tomorrow along with wooden shingles cladding the dormer

Log cabin project so far
14/04/2017

Log cabin project so far

Structure almost complete, been a good few days. 2 x velux windows, dormer and ply roof tomorrow then ready to start cla...
13/04/2017

Structure almost complete, been a good few days. 2 x velux windows, dormer and ply roof tomorrow then ready to start cladding in wainy edge Douglas Fur πŸ‘ŒπŸΌ

Damp proofed, joist work, 100 mm Celotex insulation, floor laid and 2 walls up. Log cabin starting to take shape πŸ‘ŒπŸΌ
11/04/2017

Damp proofed, joist work, 100 mm Celotex insulation, floor laid and 2 walls up. Log cabin starting to take shape πŸ‘ŒπŸΌ

As always with any of our projects we always return after 3 months to deal with settlement cracks free of charge. Proud ...
07/04/2017

As always with any of our projects we always return after 3 months to deal with settlement cracks free of charge. Proud to say that after this time and bare in mind this is a timber structure all we could find was 2 hair line cracks 200mm long each. Now this has been furnished it really looks amazing and created the perfect place to have a massage

Piles dug, filled with concrete and brick piers built, all ready to start building the log cabin on Monday πŸ‘ŒπŸΌ
07/04/2017

Piles dug, filled with concrete and brick piers built, all ready to start building the log cabin on Monday πŸ‘ŒπŸΌ

Digging metre deep piles today at the start of this huge log cabin project. Having to dig all by hand due to no access o...
05/04/2017

Digging metre deep piles today at the start of this huge log cabin project. Having to dig all by hand due to no access other than a small side gate. Log cabin will be completely unique made from reclaimed timber which will include a personalised bar...project pictures to follow in stages

Block pave drive way completed in 2 days from start to finish. Day one clearing old drive and laying strong foundation, ...
16/12/2016

Block pave drive way completed in 2 days from start to finish. Day one clearing old drive and laying strong foundation, day 2 laying the stones. For info on our services please find contact info on this page have a nice weekend ☺️

Summer house built from scratch. 3 weeks from start to finish including footings. One very happy customer. For info and ...
15/12/2016

Summer house built from scratch. 3 weeks from start to finish including footings. One very happy customer. For info and quotes please find our contact info on this page.