23/05/2026
Good morning everyone! The rain has slowed us up but kept on moving. Also when doing any projects where digging its important to check for under ground services with a before you dig checks. This job showed a gas line up the centre of the complex. That finished in close proximity. So we engaged a service locator and found that the old gas line was polly. With no trace line. And the gas company required a vaccum pot hole to confirm it didn't come through to the wall.
This is the second wall finished approximately 11 metres long with TUFFPOLY composite system in charcoal.