09/06/2026
Construction Site Report: LAURUS – Mário Sacramento 🏗️🌍
With “LAURUS – Mário Sacramento”, a multi-storey residential building in Aveiro is demonstrating the potential of timber construction in Portugal.
The five-storey structure is being built entirely from timber — including walls, floors, and the elevator and staircase core, executed using KLH® – CLT. The project stands out for meeting seismic requirements with a fully timber-based structural system.
This approach enables efficient prefabrication and smooth on-site assembly while ensuring high energy performance and living comfort.
We wish all project partners continued success and a smooth construction process.
𝐋𝐨𝐜𝐚𝐭𝐢𝐨𝐧: Aveiro, Portugal
𝐀𝐫𝐜𝐡𝐢𝐭𝐞𝐜𝐭𝐮𝐫𝐞: doisarquitectos Atelier de Arquitectura
𝐂𝐥𝐢𝐞𝐧𝐭: João Júlio Loureiro
𝐓𝐢𝐦𝐛𝐞𝐫 𝐂𝐨𝐧𝐬𝐭𝐫𝐮𝐜𝐭𝐢𝐨𝐧 + 𝐒𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐚𝐥 𝐃𝐞𝐬𝐢𝐠𝐧: TISEM
𝐏𝐡𝐨𝐭𝐨𝐠𝐫𝐚𝐩𝐡𝐲: TISEM