John Delay Fine Woodworking Got the pad poured, still waiting for approval from Lucas Cnty for the building permit.

07/10/2017

Finally! We have been told that the contractor for Katie's Porch will be here Monday (tomorrow) to start work. I'll post pics as the work proceeds

03/26/2017

Working on the work benches and work stands for the tools. Decided to make them stout and hack swivel wheels on the bottom so I can keep them out of the way when not needed and right there in the middle of the work area as needed.

03/08/2017

So okay, the workshop is completely inclosed and insulated. The tools have arrived and I am in the process of assembling and deciding how high the work benches need to be. I should have heat tomorrow or Friday and then the painting begins.

If the electrical and structural pass inspection I can start rebuilding my workshop.
02/07/2017

If the electrical and structural pass inspection I can start rebuilding my workshop.

One truss short of a roof!  Long weekend and then maybe finish the roof and start the electrical
01/15/2017

One truss short of a roof! Long weekend and then maybe finish the roof and start the electrical

Where it all happens.
01/11/2017

Where it all happens.

01/02/2017
This is me waiting for the building permit!
01/02/2017

This is me waiting for the building permit!