Hix Home Remodeling

Hix Home Remodeling General Contractor, Custom Carpenter and Licensed Electrician framing, flooring, trim and cabinetry installation, I also do all of my own electrical work.

I've been in the home building and remodeling business doing carpentry work since 1999 and got my electrical license in 2005. I started my business in 2009 and I do all types of residential remodeling, finished basements, kitchen remodels and bathroom remodels. I am the general contractor for all my projects and in addition to handling all the carpentry work myself i.e. I have a solid collection o

f sub-contractors to handle anything that Hix Home Remodeling doesn't do. So, I am always fully involved in the entire project from beginning to end.

We finished up this master bathroom remodel in Naperville today.  This was basically a cosmetic overhaul to update every...
02/20/2026

We finished up this master bathroom remodel in Naperville today. This was basically a cosmetic overhaul to update everything. We moved around and added some lighting but for the most part the footprint stayed the same. And it turned out awesome. Jax Designs

We completed this kitchen and first-floor renovation in Naperville today.  Essentially, it was a full cosmetic upgrade t...
11/21/2025

We completed this kitchen and first-floor renovation in Naperville today. Essentially, it was a full cosmetic upgrade throughout, with lighter refinished floors, custom built-in bookcases with bench seating and drawers below, an updated fireplace with a quartz surround, new handrails, newel posts, and iron spindles on the staircase, new updated trim and all new everything else. Jax Designs

Stair case we finished today at a first floor remodel we’re working on in Naperville.  This part was challenging and fun...
11/13/2025

Stair case we finished today at a first floor remodel we’re working on in Naperville. This part was challenging and fun. More pics of the rest of the house to come.

Quick mudroom, powder room we wrapped up a couple of weeks ago.  In the mudroom we did a stacked washer and dryer to add...
11/06/2025

Quick mudroom, powder room we wrapped up a couple of weeks ago. In the mudroom we did a stacked washer and dryer to add a utility sink, removed the coat closet and installed a more organized cabinetry system. Also new lighting and tile. In the mudroom, a new vanity, new lighting layout and new tile from counter to ceiling. We also replaced the front door.
Jax Designs

We finished up this basement remodel last week in Naperville.  We removed the drop ceiling and drywalled the ceilings to...
11/05/2025

We finished up this basement remodel last week in Naperville. We removed the drop ceiling and drywalled the ceilings to add height. We moved some walls around to create a new full bathroom with a custom shower, a new office and new hallway entrance to tons of unfinished storage. Carpet went in a couple days after. Jax Designs

We finished this master bathroom yesterday in Yorkville.  We doubled the size of the shower by removing the linen closet...
10/02/2025

We finished this master bathroom yesterday in Yorkville. We doubled the size of the shower by removing the linen closet and extended the standard shower into that space to make a real nice custom shower. Also relocated the tub to a new free standing tub, added cabinetry to replace the linen closet, added lots of lighting and all new everything else. Jax Designs

Another master bathroom finished up in Sugar Grove last week.  We removed an unused tub, added a makeup area, made a lar...
07/29/2025

Another master bathroom finished up in Sugar Grove last week. We removed an unused tub, added a makeup area, made a larger custom fully tiled shower and all new everything else. Shower glass goes in this week. Jax Designs

Part 1 of a massive project we finished today in Naperville is the master bathroom.  We moved the entire vanity wall 7 i...
07/24/2025

Part 1 of a massive project we finished today in Naperville is the master bathroom. We moved the entire vanity wall 7 inches into the bathroom to make enough space in a walk in closet on the other side to create a second floor laundry room. Then we eliminated an unusable steam shower and tripled its size and went to a free standing whirlpool bath tub. And then all new everything else. Jax Designs

12 weeks into a massive 1st floor remodel PLUS a big master bathroom as well.  Here’s a sneak peak at the shower transfo...
07/03/2025

12 weeks into a massive 1st floor remodel PLUS a big master bathroom as well. Here’s a sneak peak at the shower transformation in the master bathroom. We’re getting to the end of this one. Lots of pics to come. Jax Designs

We finished up this hall bathroom yesterday  in Woodridge. We removed the soffit above the tub, replaced the tub with a ...
04/12/2025

We finished up this hall bathroom yesterday in Woodridge. We removed the soffit above the tub, replaced the tub with a deeper soaker, removed the hanging pendant lights, added can lights, added a LED lighted mirror and updated everything else. Jax Designs

We wrapped up this kitchen last week in Naperville.  We removed a load-bearing wall to open the kitchen to the family ro...
04/10/2025

We wrapped up this kitchen last week in Naperville. We removed a load-bearing wall to open the kitchen to the family room, moved the kitchen sink to the island, closed off the kitchen window to add cabinetry, relocated the fridge and range and all new everything else.

We finished this complete overhaul of a 1,200 square foot basement today in Naperville.  We took everything out includin...
02/27/2025

We finished this complete overhaul of a 1,200 square foot basement today in Naperville. We took everything out including the bizarre “kitchen bathroom”, all the drop ceilings, wood subfloor and walls so we started with a blank slate. We moved the laundry room from the first floor to the new finished basement with a new washer and dryer and custom cabinetry. We added a full bathroom with custom cabinetry and a custom shower, added a workout room and
modernized the rest of the basement with new LVP flooring, sprayed ceilings and new everything else. We also redid the stair case with tread covers to match the LVP
floors and new oak handrails and iron spindles. Lastly, where the laundry room was on the first floor, we installed a custom
locker system to create a mud room off of the garage. Shower glass goes in tomorrow. Jax Designs