DeSalvatore Building & Carpentry

DeSalvatore Building & Carpentry Providing you with custom decks, hardscapes, bathrooms, kitchens, additions and more. . .all designed and built just for you!

DeSalvatore Building & Carpentry was established in 2006 and continues to serve the Capital Region though the design and building services it offers. It is owned and operated by Ryan DeSalvatore, who has an an associates from HVCC in Architecture, a Bachelors in Architecture from Hobart College, and a Masters in Architecture from Virginia Tech. We stand for integrity, quality, and excellent customer service.

Here's a mudroom from this fall! Removed the wall from where the first picture was taken from. Ran all new plumbing supp...
04/26/2022

Here's a mudroom from this fall! Removed the wall from where the first picture was taken from. Ran all new plumbing supply and drains to sink and washer/dryer hookups!! All new slim recessed lights! Cabinets from RTA Cabinet Store supplemented by custom built lockers and and Cabinet end next to dryer! Brand new window (there wasn't one there before) above the drop down folding area!

Here's a bathroom from this fall! It was a full gut job, down to the studs and subfloor. New plumbing, lighting, and dry...
04/24/2022

Here's a bathroom from this fall! It was a full gut job, down to the studs and subfloor. New plumbing, lighting, and drywall. Custom tile work throughout!!

Before, during, and after! Tight quarters, but a nice upgrade
11/24/2021

Before, during, and after! Tight quarters, but a nice upgrade

Remember this one from last fall? We got back to it this year and finished up the rest of our work. New staircase, stain...
10/13/2021

Remember this one from last fall? We got back to it this year and finished up the rest of our work. New staircase, stainless steel cable railing through, new siding and windows, new bamboo flooring, new insulation, electrical and plumbing throughout. Drywall entire first floor, plywood for the loft walls and ceiling. Tiled bathroom floor and shower (ran out of pictures, see next post) Customer will be painting the walls and the trim, we only put primer on. Customer will also be assembling their own kitchen. Stay tuned for final pictures!

Kitchen face-lift from beginning to end!! Client wanted to get of the peninsula and create an island. We recycled many c...
10/08/2021

Kitchen face-lift from beginning to end!! Client wanted to get of the peninsula and create an island. We recycled many cabinets (at the clients request), and the clients had them painted. About half of the cabinets are new, including the entire island and the cabinets in the nook.
See the plumbing and wiring above the cabinets in the first couple pictures? That's what is sometimes being hidden in soffit. This time we were able to reroute it all, but that's not alway the case. Always have your contractor check before they commit to ripping out the soffit. We used a couple of well placed, patchable holes and a camera to find out.
All new lighting in the ceiling and under the cabinets, as well as a subway tile backsplash and a herringbone pattern above the stove.

100% custom cabinets and doors!! Starting with a panorama of the final, then process, ending with the before shots. Ever...
06/25/2021

100% custom cabinets and doors!! Starting with a panorama of the final, then process, ending with the before shots. Everything fabricated and installed by us. Stained and sealed by Design collaboration with

Ready for hanging out! Shiplap is in and some is left unfinished for a rougher look. Surround sound system is installed,...
05/22/2021

Ready for hanging out! Shiplap is in and some is left unfinished for a rougher look. Surround sound system is installed, feels like your in the action! Bathroom complete with custom made vanity. Custom barn doors maximize the space while giving access to additional storage!!

Some more progress pics! At this point the entire sound system was complete and the flooring is installed and protected....
05/20/2021

Some more progress pics! At this point the entire sound system was complete and the flooring is installed and protected. The shiplap was almost done. Ready for trim, doors, and fixtures!

Shots after the drywall was taped and mudded, multiple coats. The remaining unfinished walls will be getting the shiplap...
05/02/2021

Shots after the drywall was taped and mudded, multiple coats. The remaining unfinished walls will be getting the shiplap. A mini-split unit tucked into the ceiling will provide both heat and AC. Thanks

Before and after shots. Turned out beautifully!! We have a back log of content coming your way!
04/22/2021

Before and after shots. Turned out beautifully!! We have a back log of content coming your way!

Ready for final paint, lights, epoxy floor! Getting close to the finish line!
02/28/2021

Ready for final paint, lights, epoxy floor! Getting close to the finish line!

So much Maple plywood, 1x and crown finally stained and polyurethaned! Ready to create some beautiful trim work. The 5/4...
02/05/2021

So much Maple plywood, 1x and crown finally stained and polyurethaned! Ready to create some beautiful trim work. The 5/4 Red Oak counters with a bar rail are also stained and polyurethaned and ready to install. PS, a sink will go where that knot is.

Address

Clifton Park, NY
12065

Alerts

Be the first to know and let us send you an email when DeSalvatore Building & Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DeSalvatore Building & Carpentry:

Share