28/05/2026
✔️ Project Completed
This rental had a major leak which left the subfloor beyond repair — so it was a full strip-out and rebuild to get it back to a solid rental standard.
🔨 Work carried out:
• Removed old laminate
• Cut out and replaced rotten subfloor
• Strengthened and repaired joists
• Installed new subfloor & laminate flooring
• Full redecoration throughout
• Supplied & fitted 2 new carpets
Now looking fresh, solid, and ready for new tenants ✅
Another one turned around 👍